July 24, 2011

Lazy Sunday

Went into my little hamlet for some espresso and checked in at the Grocery store and then came back out to the farm and spend a delightful day pottering about. I am shifting the music stuff around (been doing this for the last six months) and found the perfect shelving for the keyboards at the Costco Business center while driving up from Saturday's swap meet. They are the metro wire shelves but five feet long and two feet deep -- much bigger than what you normally find. Perfect fit and with them being on heavy-duty casters, I can wheel them out from the wall whenever I want to fiddle with the wiring. Looks a lot better and should streamline the workflow a bit. Also got a couple coats of paint on the boards I am going to use to mount the new 200 Amp service panel for the shop. The building is a pole building with uprights spaced every ten feet and sheet metal siding. Going to bring the new service through the sheet metal so need a pair of stringers to go between the uprights to hold the new panel. Painted a sheet of plywood for mounting the panel on -- more than what the code requires but I like to keep my wiring neat and above code requirements. Probably grab a burger at a local restaurant and head back to do some more work on the music stuff in the DaveCave(tm) The foot is still pretty raw and swollen but it is a lot stronger and I spent all day working on it and there is no discomfort -- a state quite different from before the surgery... Posted by DaveH at July 24, 2011 4:42 PM
Comments
Post a comment









Remember personal info?